Scenic drives · Alpine passes

Is the pass open? Alpine passes: season, hours, toll and vehicle limits

Checked 2 October 2026 on each pass's operator, canton, province or department pages · skynomad

Scenic drives: all 7 pages

Verdict

The season is a habit, not a promise. Check the status page on the morning you drive.

Each row below gives the pass's usual season, what happened in 2026, its hours, toll and vehicle limits, and the official page that says whether it is open today. Snow, rockfall and bike races close passes inside their season too.

How to read the table

Usually open is the operator's or the road authority's own description of the season, not a date you can rely on. 2026 is what was published for this year when the page was checked; a pass that shows "closing date not yet announced" in October is open until the authority says otherwise. Hours matter on the toll roads, such as the Grossglockner and the Timmelsjoch, which shut at night. Status now links to the page I would open before setting off.

"Not published" means exactly that: I looked for the figure on the official pages and did not find it. It is not the same as "none".

PassUsually open2026HoursTollVehiclesStatus now
Grossglockner High Alpine Road (Hochtor)AT · Private toll road · 2,504 m · the driveUsually early May to early November; snow decidesOpened 2026-04-25; closing date not yet announced (operator: 'start of November')06:00–20:00 to 31 May, 05:30–21:00 June–August, 06:00–19:30 from 1 September; last entry 45 min before; no driving at night€46.50 per car per day (€36.50 after 18:00), €36.50 per motorbike, €40.00 electric car; motorhomes 3.5–7.5 t €56.50, over 7.5 t €145.00Motorhomes and car+caravan up to 3.5 t pay the car rate; Edelweiss-Spitze side road closed to vehicles over 3.5 t; no overnight staysGrossglockner High Alpine Road — road status (homepage) ↗
Timmelsjoch / Passo del RomboAT/IT · Toll road · 2,474 mUsually spring to early November; snow decidesOpened May 2026, the earliest in the road's history (operator news of 14 May 2026); closing date not yet announced07:00–20:00€20 one way / €28 return per car, €18 / €25 per motorbike, €40 one way other vehicles, €85 season pass; return valid all seasonMax height 4 m; Italian side: motorhomes max 8 t, 2.55 m wide; trailers over 4.5 m banned; vehicle plus trailer max 10 mTimmelsjoch High Alpine Road — homepage status ↗
Silvretta High Alpine Road (Bielerhöhe)AT · Silvretta High Alpine Road · 2,032 mVorarlberg side (Partenen) closed until summer 2030 after 2024 rockfalls; Tyrolean side from Galtür open in summerTyrolean side reopened 2026-06-04; closing date not yet announced; Vorarlberg side closed all seasonNot publishedFree from the Tyrolean side during the construction works (operator)Trailers banned on the whole road; tour buses max 13.8 m; no parking at nightSilvretta-Bielerhöhe — opening times ↗
Furka PassCH · 2,429 mNot publishedOpened 2026-05-29 at 09:00; closing date not yet announcedNot publishedNot publishedNot publishedCanton Uri — Strasseninfos ↗
Grimsel PassCH · 2,164 mNot publishedOpened 2026-05-29 (Innertkirchen–Gletsch); closing date not yet announcedNot publishedNot publishedNot publishedTCS pass portal (Touring Club Switzerland) ↗
Susten PassCH · 2,234 mNot publishedPartly open from 2026-05-19 (to Sustenbrüggli); fully open from 2026-06-12 (Canton Uri); closing date not yet announcedNot publishedNot publishedNot publishedCanton Uri — Strasseninfos ↗
Gotthard Pass (pass road, not the tunnel)CH · Gotthard pass road, Andermatt–AiroloClosed about six months a year, roughly mid-November to mid-May, depending on weatherOpened 2026-05-08 at 11:00; closing date not yet announcedNot publishedNot publishedLorry trailers and articulated lorries banned from Hospental to the summitCanton Uri — Strasseninfos ↗
Tre Cime di Lavaredo toll road (Rifugio Auronzo)IT · 2,333 m · the driveUsually late May to late October; weather decidesOpened 2026-05-23; closing date not yet announcedTicket valid 12 hours from booked entry time€40 car, €26 motorbike, €60 caravan/motorhome, €80/€160 bus; online booking compulsoryMotorhomes allowed (€60); overnight in vehicle allowed, camping notComune di Auronzo — Tre Cime parking and booking ↗
Passo GiauIT · the driveNot publishedOpen; closed to traffic for the Maratona dles Dolomites on 2026-07-05Not publishedFree; no booking or traffic limit in 2026Not publishedVeneto Strade road status ↗
Passo PordoiIT · the driveNot publishedOpen; closed to motor traffic 2026-06-06 09:00–16:00 (Sellaronda Bike Day) and on 2026-07-05 (Maratona)Not publishedFree; no booking or traffic limit in 2026Not publishedProvincia di Bolzano traffic bulletin (Passi e strade di montagna) ↗
Passo Sella / SellajochIT · the driveNot publishedOpen; closed to motor traffic 2026-06-06 09:00–16:00 (Sellaronda Bike Day) and on 2026-07-05 (Maratona)Not publishedFree; no booking or traffic limit in 2026Trailers banned from Plan to the top; over 33 t banned from Miramonti to the pass (third-party listing)Provincia di Bolzano traffic bulletin (Passi e strade di montagna) ↗
Passo Gardena / Grödner JochIT · the driveNot publishedOpen; no restrictions in 2026 (digital test only Sep–Oct); closed 2026-06-06 09:00–16:00 and 2026-07-05 for cycling eventsNot publishedFree; no booking in 2026; possible traffic-calming rules from 2027, not decidedTrailers banned between Miramonti junction and Corvara (third-party listing)Provincia di Bolzano traffic bulletin (Passi e strade di montagna) ↗
Passo FalzaregoIT · the driveNot publishedOpen; closed to traffic for the Maratona dles Dolomites on 2026-07-05Not publishedFreeSemitrailers over 3.20 m high banned from Cernadoi to the top (third-party listing)Veneto Strade road status ↗
Passo dello Stelvio / Stilfser JochIT · SS38Usually late May to late October or early November; snow decidesOpened 2026-05-22 on all sides; closing date not yet announcedNo time limit on the Bormio side after the ANAS reopening; closed to cars 2026-08-29 08:00–16:00 and 2026-09-19 09:00–13:00 (Enjoy Stelvio)FreeOver 10.50 m banned from Trafoi (third-party listing)ANAS road news ↗
Passo di GaviaIT · SS300 · 2,618 mUsually late May or June to mid/late October; snow decidesOpened 2026-05-22 (Brescia side) and 2026-05-27 (Santa Caterina side); closing date not yet announcedClosed to cars 2026-06-05 and 2026-08-30, 09:00–13:00 (Enjoy Stelvio)FreeNot publishedANAS road news ↗
Col de l'IseranFR · D902 · 2,764 mOpens in principle the second Friday of June; closes for winter in autumn; snow decidesOpened 2026-06-12; closing planned 2026-11-02, weather permittingNot publishedFreeNot publishedDépartement de la Savoie — Savoie Route ↗
Col du GalibierFR · D902 · 2,642 mTunnel opens in principle the last Friday of May, summit the first Friday of June; closes for winter in autumn; snow decidesTunnel opened 2026-05-29, summit 2026-06-05; closing date not yet announcedNot publishedFreeSummit road under 3.5 t; tunnel max 4.10 m high, 3.20 m wide, under 19 t, no coaches over 3.5 tDépartement de la Savoie — Savoie Route ↗
Cime de la Bonette (Col de la Bonette loop)FR · D900 / C1 from Jausiers; M2205 from the Tinée · 2,802 mUsually May or June to October or November; snow decidesOpened 2026-04-30 according to the Ubaye tourist office; closing date not yet announcedNot publishedFree50 km/h limit on the Bonette roadAlpes-de-Haute-Provence road info (inforoute04) / Alpes-Maritimes (inforoutes06) ↗
Col de TuriniFR · D2566 / M70 · 1,607 mOpen all year; winter conditions applyNot publishedNot publishedFreeNot publishedAlpes-Maritimes road info (inforoutes06), winter viability ↗

What I would check before a pass day

Next on the road

Sources

  1. GROHAG — Prices and opening times 2026
  2. GROHAG — FAQ: heights, Edelweiss-Spitze 3.5 t limit, no camping
  3. Timmelsjoch Hochalpenstraße — Tarife 2026
  4. Timmelsjoch Hochalpenstraße — Straßenbestimmungen (vehicle limits)
  5. Timmelsjoch Hochalpenstraße — News 2026 (record opening, 07:00–20:00, 30 Aug 2026 Ötztaler Radmarathon closure)
  6. Timmelsjoch Hochalpenstraße — homepage: open 07:00–20:00
  7. Silvretta-Bielerhöhe — Opening times: Tyrolean side from 4 June 2026, Vorarlberg side closed until 2030
  8. Silvretta-Bielerhöhe — Silvretta-Hochalpenstraße: toll-free from Tyrol, trailer ban, 13.8 m bus limit, 2,032 m
  9. Plattform J (regional news, citing TCS and Canton Uri) — Furka, Grimsel and Nufenen open 29 May 2026; heights
  10. polizei.news (relaying Baudirektion Uri, 18 May 2026) — Furka still closed, road info at ur.ch/strasseninfos
  11. Canton Uri press release — 'Sustenpass ist ab Freitag, 12. Juni 2026 offen' (headline only; page not reachable)
  12. AfBN (Gotthard national-road operating unit) — Die Gotthard-Passstrasse: winter closure, 26.1 km pass section, lorry trailer ban
  13. Gotthard Live — pass opening 8 May 2026 at 11:00, citing the Federal Roads Office (ASTRA)
  14. Canton Uri press release — 'Der Gotthard ist ab 8. Mai befahrbar' (headline only; page not reachable)
  15. Comune di Auronzo di Cadore (auronzo.info) — Tre Cime parking: booking only, 2026 prices, 12-hour validity, plate change, cancellation, overnight rule
  16. Telepass Moveo — Tre Cime road reopened 23 May 2026, €40 car, about 6 km to Rifugio Auronzo at 2,333 m
  17. Alto-Adige.com — Tre Cime toll road: usually late May to late October, prices, booking via pass.auronzo.info
  18. Dolomiti Review — Maratona dles Dolomites 5 July 2026 closes seven passes incl. Giau and Falzarego
  19. InMoto (23 Aug 2025) — Passo Giau speed camera back on, limit raised from 50 to 70 km/h with Veneto Strade's approval
  20. Arabba Fodom Turismo — Sellaronda Bike Day 6 June 2026, Pordoi, Campolongo, Gardena, Sella closed 9:00–16:00
  21. Südtirol Kompakt — pass restrictions: trailer bans on Sella and Gardena, Falzarego height limit, Stelvio 10.50 m from Trafoi
  22. Gemeinde Kastelruth (17 Aug 2026) — Dolomite passes: digital test, no traffic restrictions in autumn 2026
  23. Moto.it (18 Aug 2026) — Passo Gardena: no physical limits in 2026, possible rules from 2027
  24. Valtellina Mobile (25 Sep 2026) — Stelvio opened 22 May 2026 on all three sides; usually closes late Oct–early Nov
  25. Lecco Notizie — ANAS reopens SS38 Bagni Vecchi–Stelvio and Umbrail without time limits
  26. Valtellina Mobile — Enjoy Stelvio Valtellina 2026 car-free dates on Stelvio and Gavia
  27. Valtellina Mobile (27 May 2026) — Gavia SS300 (ANAS) opened 22 May from Brescia side, 27 May from Santa Caterina; 2,618 m
  28. Haute-Maurienne Vanoise tourist office — Iseran open since 12 June 2026, closing planned 2 November 2026
  29. Explore Savoie — Iseran opens in principle the second Friday of June (source savoie-route.fr)
  30. Département de la Savoie — winter closure of the great passes, savoie-route.fr for status
  31. Wikipedia — Col de l'Iseran, 2,764 m, D902 (third-party)
  32. Valloire tourist office — 2026 opening dates, 2,642 m, D902, tunnel and summit limits
  33. Département des Hautes-Alpes — 2026 road order, RD 902 Galibier tunnel closure
  34. Ubaye tourist office — col 2,715 m, cime 2,802 m, 2026 opening, 50 km/h
  35. Route des Grandes Alpes — closes October or November, reopens May or June; inforoute04 and inforoutes06
  36. Menton Riviera Merveilles tourist office — Turini Pass, 1,607 m, open every day
  37. Route des Grandes Alpes — Col de Turini, 1,604 m, D2566 and M70, accessible year-round, inforoutes06

Each row's sources are listed below. We don't sell tickets, vignettes or tours and don't link to resellers.